Tutorial 1 1/17/19

-Part 3: Setting Up FK/IK Switching starts with a large section of joint and control building skipped, so for the sake of time and hopefully not messing anything up Project File 03_02.ma was loaded for this section instead of the previously worked on file-












Comments